Instructions / Assembly

Symmetry
Railing Installation Instructions - 10-ft. and 12-ft. Line
6
Position the top rail over the infill assembly,
and carefully lower into place.
Starting at one end of the rail, secure the top
rail with supplied 1-7/8-in. screws between
the post and first baluster (if there’s room), at
the center of the top rail, and approximately
between every second and third baluster in
the infill.
Complete the assembly by gluing the post caps in place with a quality exterior grade adhesive.
28
29
30
The most recent installation instructions can be found on our website.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.