Installation Guide

Symmetry
Railing Installation Instructions - ClearVisionSystem
Note: Prepare top rail, bottom rail and H-bar
and attach bottom rail brackets to the posts
following standard 6-ft. line railing installation
instructions prior to CVS installation.
Note: CVS Panels are for maximum railing
lengths of 6-ft., line installation only.
1
2
3
5
4
8
10
9
Position and center the CVS aluminum rail
over the bottom rail. The aluminum rail should
be flush with the aligning feature on the
bottom rail.
Predrill a 1/8-in. hole through the bottom rail
using the aluminum CVS rail as a template.
Secure the CVS rail with a #10 flathead screw.
Assemble pieces together and measure from
the top of the bottom rail to determine top
bracket height placement on the post.
Predrill the remaining holes and secure with a
#10 flathead screw.
Reposition the bottom rail over the previously
installed bottom rail brackets.
Secure the top H-bar to the posts, taking care
to level.
Position the lower CVS seal over the bottom
rail, and press-fit into the aluminum channel.
11
Position the crush block and holder inside the
bottom rail at the approximate center point.
Predrill two holes with a 1/8-in. bit and secure
with the supplied flat head screws. Do not
over tighten.
7
Measure and trim crush block to the required
final length. Secure crush block to holder
using supplied flat head screw.
6
The most recent installation instructions can be found on our website.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.