Installation Guide

Extend the adjustable crush block to the
nal height making sure the rail is level.
Lock the block in place by drilling a 5/32 in.
hole into one face, and securing with the
supplied 3/4 in. screws. Do not over tighten.
Cover the exposed head of the screw with
the supplied screw cap.
17
18
12
11
Flip the top rail so that the pre-routed holes
are facing upward. Center the bracket on
the rail. To ensure a snug installation, allow
1/32 in. to 1/16 in. clearance between the
bracket “wing” and the end of rail. Mark hole
locations.
13
Place two balusters onto the bottom rail, one
baluster on each end.
Lower the top rail onto the two balusters,
making sure to line up the baluster inserts
with the top rail routed holes, until top rail is
fully seated on balusters.
Pre-drill holes using a 5/32 in. bit (bracket
shown for clarity).
Secure the bracket with supplied 1 in.
screws. Do not over tighten.
Trim balusters to desired length and press
the top baluster inserts into one end of all
balusters and bottom baluster inserts into the
other end of all balusters.
Note: Top baluster inserts have collars and
bottom baluster inserts do not.
Ensure the top rail is level and mark the top rail
bracket hole locations.
Remove top rail and balusters. Pre-drill holes
using a 5/32 in. bit (bracket shown for clarity).
19
20
14
15
16
Secure the bottom bracket and rail to the
post using the supplied 2 in. screws. Do not
over tighten.
Tip: The use of a long bit extension, or a
exible extension, will help with accessing
the screw heads.
10
Fiberon
®
Horizon
®
Railing 6 and 8 ft. Installation Instructions
3
The most recent installation instructions can be found on our website. Please visit berondecking.com or call Consumer and Technical Support at 800-573-8841.