Installation Guide

7 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Line Rail Installation
1
Preparing the bottom rail
Position railing brackets (AA) 1/32 in. – 1/16 in. from the
ends of the bottom rail and mark the hole locations. Ensure
the railing brackets (AA) are installed on the opposite side
from the baluster holes.
Predrill holes using a 5/32 in. bit and then attach the railing
brackets (AA) to the bottom rail using 1 in. screws (BB).
DO NOT OVERTIGHTEN THE SCREWS.
AA
BB
2
Attaching crush blocks
Use PVC adhesive to glue both crush blocks (1) to the
bottom of the bottom rail at mid-point of rail length to
support the rail in a level position. When installing an 8 foot
section, place the crush blocks at 1/3 points.
1
3
Installing the bottom rail
Completely lower the rail into place between the posts and
check to make sure it is level.
Once the lower rail is level, mark the railing bracket (AA)
hole locations. Remove the rail before pre-drilling the
holes.
Pre-drill the holes with a 5/32 in. bit, angling slightly
inward to allow for clearance from the rail once
repositioned for securing.
NOTE: Using extended drill bits is recommended to prevent
damage to the rail, and allow a more perpendicular driving
angle.
Secure the bottom railing in place using the 1-1/4 in.
screws (CC).
AA
CC