Installation Guide

8
Line Rail Installation (continued)
4
Preparing the top rail
Position the railing brackets (AA) 1/32 in. – 1/16 in. from
the ends of the top rail and mark the hole locations. Ensure
railing brackets are installed on the side of the top rail with
the baluster holes.
Predrill holes using a 5/32 in. bit and then attach the railing
brackets (AA) to the top rail using 1 in. screws (BB).
DO NOT OVERTIGHTEN THE SCREWS.
AA
BB
5
Inserting balusters
Insert a baluster into the rst and last baluster holes in the
bottom rail.
NOTE: Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
6
Positioning the top rail
Carefully position the top rail between the posts and lower
onto the two balusters. Ensure you fully seat the balusters
into the top rail.
Check the top rail and ensure it is level.
7
Marking and drilling top rail holes
Mark the location of the bracket holes.
Remove the top rail and balusters. Pre-drill the holes with
a 5/32 in. bit, angling slightly inward to allow for clearance
from the rail once repositioned for securing.