Installation Guide
8
Line Rail Installation (continued)
4
Preparing the top rail
□ Position the railing brackets (AA) 1/32 in. – 1/16 in. from
the ends of the top rail and mark the hole locations. Ensure
railing brackets are installed on the side of the top rail with
the baluster holes.
□ Predrill holes using a 5/32 in. bit and then attach the railing
brackets (AA) to the top rail using 1 in. screws (BB).
DO NOT OVERTIGHTEN THE SCREWS.
AA
BB
5
Inserting balusters
□ Insert a baluster into the rst and last baluster holes in the
bottom rail.
NOTE: Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
6
Positioning the top rail
□ Carefully position the top rail between the posts and lower
onto the two balusters. Ensure you fully seat the balusters
into the top rail.
□ Check the top rail and ensure it is level.
7
Marking and drilling top rail holes
□ Mark the location of the bracket holes.
□ Remove the top rail and balusters. Pre-drill the holes with
a 5/32 in. bit, angling slightly inward to allow for clearance
from the rail once repositioned for securing.