Installation Guide

11 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Stair Railing Installation (continued)
5
Preparing the bottom rail installation
Place the lower rail and brackets in place, and locate and
mark the screw holes.
Remove the rail and brackets, and pre-drill with a 1/8-in.
bit.
6
Installing the bottom rail
Secure the bottom rail using the #10 x 1.5 in. screws (JJ).
DO NOT OVERTIGHTEN THE SCREWS.
Place the crush block on the stair tread surface midway
between the posts and glue to bottom of bottom rail.
JJ
7
Positioning the top rail
NOTE: Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
Insert a baluster into the rst and last holes in the bottom
rail. Carefully position the top rail over the balusters. Lower
until the balusters are fully inserted.
With the top rail fully seated, and using the top bracket as a
guide, mark the location of the holes.
8
Drilling the top rail holes
Remove the rail before pre-drilling the holes.
Predrill the holes with a 1/8 in. bit.