Installation Guide

7 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Line Rail Installation
1
Preparing the bottom rail
Place the bottom railing bracket (BB) over the ends of the
bottom rails.
Center the crush block on the deck surface between posts.
Set the bottom rail on top of the crush block and ensure
the rail is level.
BB
2
Tracing the bottom railing bracket
Lightly trace a line to show the location of the bottom of
the bracket (BB).
BB
3
Attaching the bottom bracket ange
Remove the bottom rail and mark the bottom bracket
ange(CC) holes.
Pre-drill holes using a 1/8 in. bit and then attach the bottom
bracket ange (CC) using the #10 x 1.5 in. screws (DD).
DO NOT OVERTIGHTEN THE SCREWS.
CC
DD
4
Installing the bottom rail
Snap/lock the bottom rail in place.
5
Attaching crush blocks
Use PVC adhesive to place and glue crush blocks (1) to
the bottom of the bottom rail at mid-point of rail length to
support the rail in a level position.
1