Installation Guide
7 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Line Rail Installation
1
Preparing the bottom rail
□ Place the bottom railing bracket (BB) over the ends of the
bottom rails.
□ Center the crush block on the deck surface between posts.
Set the bottom rail on top of the crush block and ensure
the rail is level.
BB
2
Tracing the bottom railing bracket
□ Lightly trace a line to show the location of the bottom of
the bracket (BB).
BB
3
Attaching the bottom bracket ange
□ Remove the bottom rail and mark the bottom bracket
ange(CC) holes.
□ Pre-drill holes using a 1/8 in. bit and then attach the bottom
bracket ange (CC) using the #10 x 1.5 in. screws (DD).
DO NOT OVERTIGHTEN THE SCREWS.
CC
DD
4
Installing the bottom rail
□ Snap/lock the bottom rail in place.
5
Attaching crush blocks
□ Use PVC adhesive to place and glue crush blocks (1) to
the bottom of the bottom rail at mid-point of rail length to
support the rail in a level position.
1