Installation Guide

8
Line Rail Installation (continued)
6
Preparing the top rail
Place top rail brackets (AA) over each end of the top rail.
AA
7
Inserting balusters
Insert a baluster into the rst and last baluster holes in the
bottom rail.
NOTE: Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
8
Positioning the top rail
Carefully position the top rail between the posts and lower
onto the two balusters. Ensure you fully seat the balusters
into the top rail.
Check the top rail and ensure it is level.
9
Marking and drilling top rail holes
Lightly trace a line to show the location of the top rail
bracket (AA).
Remove the top rail and mark the location of the bracket
ange. Then pre-drill holes with a 1/8 in. drill bit and
attach the top bracket ange (CC) using the #10 x 1.5 in.
screws(DD).
AA
CC
DD