Installation Guide
8
Line Rail Installation (continued)
6
Preparing the top rail
□ Place top rail brackets (AA) over each end of the top rail.
AA
7
Inserting balusters
□ Insert a baluster into the rst and last baluster holes in the
bottom rail.
NOTE: Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
8
Positioning the top rail
□ Carefully position the top rail between the posts and lower
onto the two balusters. Ensure you fully seat the balusters
into the top rail.
□ Check the top rail and ensure it is level.
9
Marking and drilling top rail holes
□ Lightly trace a line to show the location of the top rail
bracket (AA).
□ Remove the top rail and mark the location of the bracket
ange. Then pre-drill holes with a 1/8 in. drill bit and
attach the top bracket ange (CC) using the #10 x 1.5 in.
screws(DD).
AA
CC
DD