Installation Guide

9 FIBERONDECKING.COM
Please contact 1-800-230-7547 for further assistance.
Line Rail Installation (continued)
10
Installing the balusters and top rail
Install all balusters into the bottom rail.
Seat the balusters into the top rail and press down on the
brackets to snap/lock the top rail into place.
Pre-drill two holes in the ange at the bottom of the
bracket (AA) 2-1/2 in. deep with a 1/8 in. bit.
Secure the top rail using two #10 x 2.5 in. screws (EE). DO
NOT OVERTIGHTEN THE SCREWS.
EE
AA
11
Installing the post caps
Complete the installation by installing the post cap in place.
You can use a quality exterior adhesive in order to do this
but note that you will not be able to remove the cap at a
later time once it is glued.