Installation Guide
24
Find the 1/3 and 2/3 points for the two crush
blocks (provided) to be installed. Placement
can varry based on stair tread height and
depth. Ensure that the Crush block placement
is no higher than 6-in. from step surface.
23
Approximate 1/3 and 2/3
with even baluster count
Position and support the bottom U-channel
between the stair posts. Starting from the top,
secure the bracket using the supplied #10 x
2-1/2-in. screws. Do not over tighten.
Secure the bottom rail using the supplied #10
x 2-1/2-in. self-drilling screws.
Note: As stair angles increase, it may help to
mark the holes rst, then move the bracket
out of the way to partially start the drilling tip
through the post sleeve prior to fully inserting
the screws.
26
27
Using a utility knife, carefully remove the four
tabs on the perimeter of the crush block
holder.
Note: The angled crush block will not t in the
holder properly if holder is oriented with the
baluster opening facing either towards the
deck or towards the yard.
21
Position crush block at the points marked on
the bottom of the U-channel. Transfer both
“V” hole locations to the U-channel. Drill with
3/16-in. bit.
24
Secure crush block holder to U-channel with
two #8 x 1-in. self-drilling flat head screws. Do
not over tighten.
25
Before assembling the crush block, transfer
the stair angle to the end of the crush block
and cut to desired length.
20
22
Secure crush block to crush block holder
using a supplied #8 flat head screw. Do not
over tighten.
The most recent installation instructions can be found on our website.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Symmetry
Railing Installation Instructions - Stair Aluminum Balusters