Installation Guide
25
Carefully position the pre-assembled railing in-
fill between the posts, then slowly lower over
the bottom brackets until fully seated.
28
Center the H-bar on the post and check rail
for plumb.
29
Starting at the top, secure the H-bar to the
posts at both ends using the supplied #10 x
2-1/2-in. self-drilling pan head screws. Do not
over tighten.
30
The most recent installation instructions can be found on our website.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Position the top rail over the H-bar, and
carefully lower until fully seated.
31
Starting at one end of the rail, secure the top
rail with supplied 1-7/8-in. screws between
the post and first baluster (if there’s room), at
the center of the top rail, and approximately
between every second and third baluster in the
infill.
32
Finally, position and glue the post cap over the
post sleeve.
33
Symmetry
Railing Installation Instructions - Stair Aluminum Balusters