Installation Guide
Symmetry
Railing Installation Instructions - ClearVisionSystem
12
14
19
15
16
17
18
11
13
Insert the top CVS rail into the H-bar.
Tip: Use clamps to keep top Symmetry rail
and CVS channels firmly together.
Secure the CVS rail through the H-bar and into
the top rail using the supplied #10 x 1-7/8-in.
self-drilling screws.
Insert the acrylic sheet by angling it upwards
from the deck side of the guardrail.
Complete the installation by gluing post caps
in place.
Gently push the acrylic sheet fully into the top
seal until it’s fully inserted into the top rail. It
should just be able to swing over the bottom
seal when correctly spaced.
Center the acrylic panel over the bottom seal,
then gently pull it downward until fully seated.
Predrill a 1/8-in. hole for a #10 x 1-1/2-in.
screw.
Secure the bottom rail through the bottom rail
bracket by predrilling a 1/8-in. hole for a #10 x
1-1/2-in. screw.
Position the top rail over the H-bar, and
carefully lower into place. Center the top CVS
aluminum channel under the H-bar.
Center the CVS top seal under the top rail,
and press-fit into place.
12
The most recent installation instructions can be found on our website.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.