Installation Guide

17
Secure using the supplied #10 x 5/8-in. self-
drilling screws.
14
17
Approximate center on a rail
section with even balusters
Position the crush block and holder into the
bottom rail, and locate the two screw holes.
Remove the holder and predrill using a 1/8-in.
drill bit. Reposition the crush block and holder,
and secure with the supplied #8 x 1-in. screws.
Do not over tighten.
18
Secure the bottom stair brackets to the post
using the supplied pan head screws at the
desired height. Do not over tighten.
Note: For best results predrilling bracket holes
on post with a 1/8-in. - 5/32-in. bit is strongly
recommended to ensure accurate screw
placement and full insertion, particularly as the
stair angle increases.
Carefully position the pre-assembled railing
infill between the posts, then slowly lower over
the bottom brackets until fully seated.
15
19
Center the H-bar on the post and check rail
for plumb.
20
Approximate 1/3 and 2/3
with even baluster count
Starting at the top, secure the H-bar to the
posts at both ends using the supplied #10 x
2-1/2-in. self-drilling pan head screws. Do not
over tighten.
21
For 6-ft. rails sections, position the crush
block and holder inside the bottom rail at the
approximate center point.
For 8-ft. rail sections, position the two crush
blocks and holders inside the bottom rail at
the approximate 1/3 and 2/3 points.
16
Cut the crush block to the required length.
Secure crush block to the crush block
holder using a supplied #8 x 1-in. screw.
Note: the screw will be off-center in the
crush block.
The most recent installation instructions can be found on our website.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Symmetry
Railing Installation Instructions - Stair Aluminum Balusters