Installation Guide

6
9
Position the top of the balusters tightly
against the inside of the top H-bar. Center
the balusters under the side-mounting screw
holes. Working from one end to the other,
secure each baluster using the supplied #8 x
1-1/2-in. flat head screws. Do not over tighten.
10
Assemble and attach the crush block
following standard line railing instructions.
Position the assembled bottom rail, balusters,
and H-bar over the bottom brackets and
carefully lower into place and secure the top
brackets with the supplied #10 x 2-1/2-in.
screws.
Insert top brackets into the cavity of the
aluminum H-bar making sure that the top
bracket is located within the boundaries
of the H-bar. If the bracket is outside of the
boundaries, the top rail will not fit over the
H-bar and bracket. Secure with the supplied
#10 x 5/8-in. self-drilling screws.
11
Position the top rail over the infill assembly,
and carefully lower into place.
12
NO YES
Symmetry Railing Installation Instructions - Angled Line
Starting at one end of the rail, secure the top
rail with supplied 1-7/8-in. screws between
the post and first baluster (if there’s room), at
the center of the top rail, and approximately
between every second and third baluster in
the infill.
Complete the assembly by gluing the post
caps in place with a quality exterior grade
adhesive.
13
The most recent installation instructions can be found on our website.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.