Installation Guide

8. Secure the top bracket to the top rail using three #10 x 1"
(3 cm) long screws. Repeat for opposite end.
Do not over-
tighten screws..
9. Ensure that the Post Sleeve Molding is in place at the bottom of
the posts.
10. Secure crush block support with supplied screw to 1/3 points of
underside of bottom rail. Slide crush blocks onto supports.
11. Place the bottom rail and crush blocks between the posts and
on the crush block. Ensure that the bottom rail is level and that
the ends of the rail are centered on the post.
12. Mark on the post the two bottom bracket hole locations. Pre-drill
1/8" (3 mm) holes at desired locations. Repeat for opposite end.
13. Secure the bottom rail to the post using two #10 x 2" (5 cm)
long screws. Repeat for opposite end.
Do not over-tighten
screws.
Note: A exible shaft or extended bit holder (not included) is helpful
during this step.
14. Determine the desired baluster design (squared look, diamond
look or a mixed pattern of the two. Note: Diamond pattern is not
possible on stair sections (Figure 3).
15. Ensure that all of
the balusters are of
equal length. Trim if
necessary.
16. Fully engage the
bottom baluster
dagger (Figure 4)
into each baluster
slot in the bottom
rail. Orient the
bottom baluster
dagger to achieve
the desired look
(Figure 3).
17. Fully engage a baluster
over each bottom
baluster dagger.
18. Fully engage the top
baluster dagger (Figure
5) into each baluster slot
in the top rail. Ensure
that the top baluster
dagger is oriented
the same as the
corresponding bottom
baluster dagger.
19. Place the top rail
between the post and above the top end of the balusters.
Starting at one end of the rail, reposition top end of the baluster
to allow the top baluster dagger to engage. Repeat for each
Line Rail Installation
1. Measure the distance between properly installed, plumb posts.
2. Mark the top rail for the inside distance between the posts. The
distance from the end of the rail to the first baluster slots should
be equal on both ends of the rail. Ensure that the bracket
screws will fasten into the top rail and that none fall into the
routed baluster slots.
Note: Minimum distance from post to rst baluster slot on top rail is
2 -1/8" (5 cm).
3. Place the bottom rail next to the top rail so that the top and
bottom baluster slots are aligned. Mark the bottom rail for the
inside distance between the posts.
4. Cut the top and bottom rails to fit tightly between the posts.
5. Center the bottom bracket on the underside of the bottom rail
(Figure 1). Inset the bottom bracket 1/16" (2 mm) from the end
of the rail. Mark the three hole locations on the rail. Pre-drill 1/8"
(3 mm) holes at the desired locations. Repeat for opposite end.
6. Secure the bottom bracket to the bottom rail using three #10 x
1" (3 cm) long screws. Repeat for opposite end.
Do not over-
tighten screws.
7. Center the top bracket on the underside of the top rail (Figure
2). Inset the top bracket 1/16" (2 mm) from the end of the rail.
Mark the three hole locations on the rail. Pre-drill 5/32" (4 mm)
holes at the desired locations. Repeat for opposite end.
Horizon
®
Railing Installation Instructions
Mission & Provincial
13
For the most up-to-date instructions, visit fiberondecking.com.
Bottom
Bracket
Bottom Rail
1"
(3 cm)
#10 Bottom Rail Screw
2"
(5 cm)
1
Bottom
baluster
insert
4
Top
Bracket
#10 Top Rail Screw
1"
(3 cm)
2"
(5 cm)
2
Mission Top Rail
Top
baluster
insert
5
Square
pattern
Diamond
pattern
3

Summary of content (4 pages)