Submittal Sheet

Table Of Contents
Model IDB
Inside Duct Mounting Bracket
SUBMITTAL SHEET
e
SUBMITTAL FORM
SUBMITTED BY:
JOB:
ARCHITECT:
ENGINEER:
CONTRACTOR:
LOCATION:
®
1) Find a suitable location to install the humidifier in the supply or return plenum.
2) Place the template on the side of the duct in the location the humidifier is to
be installed. Make sure no other internal components exist in that location that may be
damaged. i.e. Evaporator Coil, UV Lamp, etc.
3)Place the template on the duct in a level position. The template can be easily adjusted.
The adhesive is not permanent.
4) Drill the 10 holes shown on the template using an 1/8” drill bit (DO NOT DRILL LARGER
THAN 1/8” DIAMETER)
5) Cut out the solid line area as marked on the template.
6) Remove the template from the duct.
7) Place bracket onto duct and line up the holes in the bracket with the holes in the duct.
8) Fasten the bracket to the duct using the provided sheet metal screws.
9) Slide the humidifier into the bracket and secure to bracket with the provided screws.
10) Refer to S2020/S2000 Steam Humidifier installation instructions to continue with the
installation.
The model IDB is an optional installation accessory for the S2000 and S2020 Steam
Humidifier. The IDB is designed to ease the mounting process and facilitate removal of
the humidifier for inspection and maintenance.
Existing duct work. (Humidifier
should not occupy more than 25%
of cross-sectional area of duct.)
Cut opening and drill
holes using template.
IBD Mounting Bracket
S2000/S2020
Steam Humififier
Copyright © Field Controls 2011 All Rights Reserved
P/N 090377A0141 REV. B

Summary of content (1 pages)