Installation instructions
F O R A LIFE O F S T YLE
TM
206 wembly Road.
New Windsor, NY 12553
Phone: 718.602.6060
Fax: 718.963.2082
info@nextures.com
www.nextures.com
3
As per drawing, - L1 is distance between the two
lines on straight tube. - L2 is distance between
the two lines on connecting pipe.
Cut the straight tupe and connect the pipe as
per above drewing.
Polish the cutting surface to get chamfer angle
as per drawing and deburring.
Apply lubricant on joint surface of straight tube
and connect the pipe.