User Manual Single Searing Station
17
INSTALLATION (cont.)
To install using a power supply box (not included):
1. Install the power supply box at least 12 inches below
the bottom of the searing station.
2. Fasten the power supply box to the inside of the
enclosure.
3. Connect the power supply box connectors to the searing
station wire harness extension, as shown in Fig. 17-1,
A (molex and ground wire connections).
4. Connect the searing station wire harness extension to
the searing station, as shown in Fig. 17-1, B (molex and
ground wire connections).
5. Connect the cord coming from the power supply
box to a 120VAC (15 AMP minimum) GFCI
GROUNDED 3-wire receptacle. See Fig. 17-1,
C, and 17-2.
WARNING: Electrical Grounding Instructions - The
power supply box is equipped with a
three-pronged (grounding) plug for your
protection against shock hazard and
should be plugged directly into a properly
grounded three-prong receptacle. Do not
cut or remove the grounding prong from
this plug.
Fig. 17-2 Connect power cord
3-wire GROUNDED
cord from unit
120VAC (20 AMP minimum) GFCI
GROUNDED 3-wire receptacle
Fig. 17-1 Connect searing station to power supply
A
B
Searing station
Searing station
wire harness extension
Power supply
box
C