Installation Instructions

6
SUBSTRATE
When adding any substrate to the enclosure front wall (including tiles, stone, etc.), consider the following:
Substrate Behind Control Panel
Substrate Alongside Control Panel
C
C
Flush
(Control panel)
(Countertop)
(Countertop)
(Control panel)
Substrate
(includes tiles,
etc. at front of
enclosure)
Countertop
overhang
(if applicable)
Flush
Substrate
(includes tiles,
etc. at front of
enclosure)
1
/4"
Clearance
Any additional substrate alongside the control panel
does not need to be considered in Dim. C (see previous
page), however a
1
/4" clearance on each side (same as
overhang) and below is required.
Substrate
+
countertop "front to back" cutout
must equate to Dim. C (see previous page)
when the substrate sits fl ush behind the
control panel.
Fig. 6-2 Fig. 6-3
Countertop
overhang
(if applicable)
TOP VIEW TOP VIEW
1
/4"
Clearance
MODEL SPECIFICATIONS (cont.)
REV 0 - 1412031145
L-C2-451
DOUBLE SEARING STATION DIMENSIONS TABLE
Double
searing
station
liner
Double
searing
station
liner
I
F
G
Fig. 6-1
H
Height Width Depth
(Top to bottom) (Left to right) (Front to back)
Top of hanger to
bottom of unit
(E)
Top of hanger to
top of open lid
(F)
Hanger to hanger
(G)
Control panel
width
(H)
Maximum depth
(I)
12" 23" 23
3
/4" 19
3
/4" 24
3
/4"
E