Product Manual
Installation
40 firstAir screw compressor FAS03 – 37
In the event of installation in a
closed room, install an air extrac-
tion device on the top of the ma-
chine to discharge the hot air.
Schematic diagram of the installation requirements for the screw compressor
Ensure their is a free space for mainte-
nance of 700 mm at the front.
The floor must be level and horizon-
tal. Provide rubber padding on the
four corners to minimise vibrations
and noise development.
The cooling air inlet is positioned on
this side, and requires a free space of
at least 500 mm.










