Product Manual

Maintenance
74 firstAir screw compressor FAS03 37
13.4 Measures on completion of maintenance
After completion of the maintenance work and before switching the
machine on, carry out the following steps:
1.
Check all screw connections which were unfastened beforehand
to make sure they are tightened.
2.
Check whether all protective devices and covers removed before-
hand have been reinstalled properly.
3.
Ensure that all tools, materials and other items of equipment that
were used have been removed from the work area.
4.
Carefully open the compressed air network-side shut-off valve.
5.
Clean the work area and remove any substances such as flu-
ids, processing material or similar that may have escaped.
6.
Ensure that all safety equipment on the machine functions per-
fectly.