Operation Manual

9
Assembly Instructions
STEP 2
Mounting Rower Seat and Upper Mainframe
REQUIRED
Left/Right Side Rails [2]
Rower Seat [4]
To install the rower seat, spread the Left/Right Side Rails[2]
slightly and drop the Rower Seat[4] into the track.
Note Seat indentation must face rearward.
Seat Indentation
Left/Right Side Rails
Rower Seat
2
REQUIRED
Mainframe [1]
8x M8 Washers [10]
4x M8 Standard Nuts [11]
4x Nyloc Nuts [12]
4x M8x45mm Bolts [14]
STEP 3
Next, install the Mainframe[1] onto the Side Rail Assembly
as shown. You will need 4x M8x45mm Bolts[14], 8x M8
Washers[10], 4x M8 Standard Nuts[11] and 4x M8
Nyloc Nuts[12].
Secure but DO NOT TIGHTEN. You will find that the lower
bracket bolts can be difficult to access. You can tighten
these bolts completely with the rower standing in the
Vertical position easily once the footboard has been
mounted, so for the moment, simply align and loosely thread
lower bolts/nuts.
Bolt Assembly Close Up
M8 Standard Nut
M8x45mm Bolt
M8 Washer
M8 Nyloc Nut
CAUTION
Nyloc nuts must be outside
the standard nut and washer
to properly secure assembly.
Note: Clean wheels and
tracks weekly with a soft dry
cloth in order to decrease
the rate of wear on both
wheels and track.
Nyloc
Nuts
Nyloc Nuts must be
outside the standard nut
and washer to properly
secure assembly.
Nyloc
Nuts