Operation Manual

20
Assembly Instructions VX-2
STEP 6
Installing S-Bend and Frame Tensioning Bolt - VX-2
a) Carefully lower the Rower to its normal operating
position to complete assembly with S-bend
installation and Frame Tension Cable.
Install rear of S-Bend[8] onto the Upper Frame
using M10x80mm Bolt[14], M10 Nyloc Nut[17]
and 2 x M10 Washers[20].
b) Attach the S-Bend to the Footplate as shown. Tilt
the Upper Frame slightly forward to align in the
proper position.
Note: The M10x15mm S-Bend Bolt with washer is
pre-installed on the S-Bend for your convenience.
c) Align the Frame Tension Cable[4] eyelet with the
Bracket on Lower Frame and install with
M10x40mm Bolt[11], 4x M10 Plastic Washers[19]
(2 either side of eyelet and inside the Metal
Bracket) and M10 Nyloc Nut[17].
REQUIRED
Frame Tension Cable[4]
S-Bend [8]
M10x40mm Bolt [11]
M10x80mm Bolt [14]
2 x M10 Nyloc Nut [17]
4 x M10 Plastic Washers [19]
2 x M10 Washers [20]
d) Align and screw the opposite end into the Rear Leg
as shown. Tension until taut and then secure with
Retaining Nut.
c)
a)
b)
c)
d)
b)
a)
d)