Operation Manual

11
Assembly Instructions- E-520
a) Locate and unwrap the Bungee Shock Cord from the
frame before moving onto the installation of the seat
rails. .
b) Once the Mainframe is safely standing upright on a stable
surface, unpack the Left/ Right Seat Rails[2] and hardware
kit from Box 2 for the next step of assembly.
1
1
12
STEP 2
Attach Seat Rails to Frame
c) Align and secure lower attachment points using M10x70
mm Bolts[12], M10 Nylock Nuts[8] and M10 Washers[7]
Seat Rail Attachment Points
Left Seat Rail
Right Seat Rail
Note: 2 x M10 x 70mm Bolts are Preinstalled on the Seat Rails For your
Convenience
2
1
12
8
REQUIRED
Mainframe [1]
Left/Right Seat Rail [2]
4 x M10 Washers [7]
4 x M10 Nylock Nuts [8]
2 x M10 x 70mm Bolts [12]
Bungee Shock Cord
CAUTION
Nylock Nuts must be
outside the standard nut
and washer to properly
secure assembly