Operation Manual

12
Assembly Instructions- E-520
1
1
f) Before installation of the right Seat Rail[2], thread the Bungee Shock Cord through
the top of the Seat Rail, around the Bungee Pulley and out the bottom as shown
g) Once this is complete, follow the same assembly procedure for the left Seat Rail.
e) Install lower left Seat Rail[2] using M10x70mm Bolts[12], Nylock Nuts[8]
and M10 Washers[7].
Left Seat Rail
Left Seat Rail
Attach Seat Rails to Frame
Note: 2 x M10x70mm Bolts are Preinstalled on the Seat Rails For your Convenience
d) Begin with left Seat Rail[2]. using the preinstalled M10x70mm[12] Secure from
behind with M10 Nylock[8].
Bungee Shock Cord
Right Seat Rail
Bungee Pulley