Operation Manual

27
Maintenance
Item Time Frame Instructions Notes
Seat and Seat
Rails.
Weekly. Wipe seat rails with a clean, dry cloth.
Lightly spray the inside of rails with
silicone spray.
Frame.
Weekly. Wipe down with lint free cloth.
Tank and Water
Treatment.
12 months to 2
years.
Follow instructions as specified in the
“Water Treatment” section of this
manual.
Bungee Cord.
Check every
hundred hours for
correct tension
and for signs of
wear.
The Bungee Cord should last for many
years. If a bungee cord change is
required, please follow the instructions
provided in the “Changing the Bungee
Cord” section of this manual.
Rowing Belt.
Check every
hundred hours for
correct tension
and for signs of
wear.
The Rowing Belt should provide many
years of trouble free use. If a rowing
belt change is required, please contact
your local service representative or go
online at www.firstdegreefitness.com
for further details.
All preventive maintenance activities must be performed on a regular basis. Performing
routine preventive maintenance actions can aid in providing safe, trouble-free operation
of all First degree fitness equipment.
First degree fitness is not responsible for performing regular inspection and maintenance
actions for your machines. Instruct all personnel in equipment inspection and maintenance
actions and also in accident reporting and recording.
First degree fitness representatives are available to answer any questions that you may
have.