13.4.17 Kapitel/Chapter 5: Basics - Seite/Page 31
seconds. Repeat this procedure 2 times.
Perform visual check of the generator similar to initial commissioning and start up generator.
Note: Fischer Panda recommends:
After extended downtimes, a full 150 h inspection as per the
inspection list should be performed.