Product Manual
Table Of Contents
- Marine Generator Manual
- Current revision status
- 3. General Instructions and Regulations
- 3.1 Safety first!
- 3.2 Tools
- 3.3 Manufacturer declaration in accordance with the Machinery Directive 2006/42/EC
- 3.4 Customer registration and guarantee
- 3.5 Safety Instructions - Safety First!
- 3.5.1 Safe operation
- 3.5.2 Observe safety instructions!
- 3.5.3 Personal protective clothing (PPE)
- 3.5.4 Cleanliness ensures safety
- 3.5.5 Safe handling of fuels and lubricants
- 3.5.6 Exhaust fumes and fire protection
- 3.5.7 Safety precautions against burns and battery explosions
- 3.5.8 Protect your hands and body from rotating parts!
- 3.5.9 Anti-freeze and disposal of fluids
- 3.5.10 Implementation of safety inspections and maintenance
- 3.6 Warning and instruction signs
- 4. In case of Emergency First Aid / Im Notfall - Erste Hilfe
- 5. Basics
- 5.1 Intended use of the machine
- 5.2 Purpose of the manual and description of the definitions of the trained persons/operators/users
- 5.3 Components of the i-system
- 5.4 Panda transport box
- 5.5 Opening the GFK sound insulation capsule
- 5.6 Transport and loading/unloading
- 5.7 Special service instructions and measures for extended machine downtimes and decommissioning
- 6. Panda 5000i PMS generator
- 7. Installation Instructions
- 7.1 Personal requirements
- 7.2 Place of installation
- 7.3 Generator Connections
- 7.4 Installation of the cooling system - raw water
- 7.4.1 General information
- 7.4.2 Installation of the through hull fitting in Yachts - scheme
- 7.4.3 Quality of the raw water sucking in line
- 7.4.4 Generator installation above waterline
- 7.4.5 Generator installation below waterline
- 7.4.6 First filling and ventilation of the internal cooling water circuit
- 7.4.7 Temperature check for controlling the cooling water circuit
- 7.5 Installation of the water cooled exhaust system
- 7.6 .Installation of the waterlock
- 7.7 Exhaust / water separator
- 7.8 Installation exhaust water separator
- 7.9 Fuel system installation
- 7.10 Ventilating the fuel system
- 7.11 Generator DC system installation
- 7.12 Generator AC System Installation
- 7.13 Checking and filling of the oil circuit
- 7.14 Isolation test
- 7.15 Initial operation
- 8. Maintenance Instructions
- 8.1 Personal requirements
- 8.2 Personal requirements
- 8.3 Hazard notes for the maintenance and failure
- 8.4 Environmental protection
- 8.5 General maintenance instructions
- 8.6 Maintenance interval
- 8.7 Oil Change Intervals
- 8.8 Checking oil-level
- 8.9 Replacement of engine oil and engine oil filter
- 8.10 Verifying the starter battery and (if necessary) the battery bank
- 8.11 Checking the water separator in the fuel supply
- 8.12 De-aerating of the coolant circuit / freshwater
- 8.13 The raw water circuit
- 9. Generator Tables
- 10. Inverter Panda PMGi 5000
- Panda iControl2
- Current revision status
- Hardware
- 11. Safety instructions for the Panda iControl2
- 12. General operation
- 12.1 The Panda iControl2 panel
- 12.2 Starting preparation / Checks (daily)
- 12.3 Operation
- 12.4 Other operating functions
- 12.4.1 Set-up menu
- 12.4.2 Setting the brightness of the backlight ("backlight" and "dimtime")
- 12.4.3 The configuration menu ("config")
- 12.4.4 The network ID
- 12.4.5 Saving settings and exiting the set-up menu ("Save & Exit")
- 12.4.6 Activating/deactivating the autostart function ("Autostart")
- 12.4.7 Resetting the service interval ("Service")
- 12.4.8 Priming the fuel system ("Prime Fuel")
- 12.4.9 Selecting and saving a unit for the temperature value output
- 12.5 iControl2-Emergency-Stop
- 13. Installation
- 14. Maintenance
- 15. Annex
- 16. Warnings and error messages
- 16.1 Warnings
- 16.2 Faults
- 16.3 The error memory of the iControl 2 Panel
- 16.3.1 How to get to the error memory of the iControl2 Panel?
- 16.3.2 How are stored errors displayed?
- 16.3.3 How do I exit the error memory after having read the entries?
- 16.3.4 Can I delete the error memory?
- 16.3.5 Where are the errors stored?
- 16.3.6 In which language are the stored errors displayed?
- 16.3.7 Is it possible to upgrade an old iGenerator model by the error memory?

Installation Instructions
Seite/Page 70 - Kaptitel/Chapter 7: Installation Instructions 13.4.17
7.13 Checking and filling of the oil circuit
Check oil and fill the oil circuit as described in the service chapter.
7.14 Isolation test
ATTENTION!After installation, before bringing into service and
handover of the generator to the customer, an isolation
test has to be accomplished as follows:
1. Switch off all electrical load.
2. Start the generator.
3. Measure the AC-voltage with a voltmeter (adjust to Volt/AC) between:
a) generator housing and AC-Control box
b) generator housing and ground.
The measured voltage must not exceed 50 mV (millivolt).
4. Once the safety systems have been installed, they must be checked. If a leakage current relay (RCD) has been
installed, it also has to be tested in order to ensure that all contacts are connected properly. The individual
phases have to be checked against each other, and between phase and ground. An additional 4th phase (L1’)
also needs to be checked at generators with DVS winding.
5. If the generator is protected by a ground connection, it has to be ensured that ALL electrical devices must also be
connected to this „common“ ground (usually ground contacts are attached to the device’s metallic housing).
The electrical system installation must also comply with the hook-up requirements of the shore current grid.
Generally a leakage current relay (RCD) is sufficient for safe electrical operation; how ewer, this must be confirmed
by the electrical safety standard in the region where the system is attached to a main land power grid. The release
current of the relay (RCD) has to meet the installation circumstances.
7.15 Initial operation
After successful installation an initial operation has to be performed.
For this purpose the initial operation record has to be completely filled out by the installing expert. The filled record
has to be handed out to the owner.
The owner has to be instructed regarding handling, servicing and risks of the generator. This applies to the service
steps and risks mentioned in the manual as well as further risks which may arise from the specific installation and
the connected components.
Note:The original initial operation record has to be sent to
Fischer Panda to receive the complete guarantee. Please
make a copy for your own documentation.