Quick Start Guide
Table Of Contents
- 1 Safety and warnings
 - 2 Integrated columns
 - 3 Components list
 - 4 Product dimensions and specifications
 - 5 Cabinetry options
 - 6 Cavity dimensions
 - 7 Door and toe kick panel dimensions
 - 8 Custom door panel dimensions
 - 9 Door opening rotation
 - 10 Electrical and plumbing
 - 11 Before installation
 - 12 Unpacking and moving your product
 - 13 Attach the anti-tip bracket
 - 14 Connect to water and power supply
 - 15 Single installation
 - 16 Dual installation
 - 17 Install water filter
 - 18 Install brackets to door panel (Stainless steel)
 - 19 Install brackets to door panel (Custom)
 - 20 Install door panels
 - 21 Install toe kick
 - 22 Install kickstrip grille
 - 23 Install cabinet trims
 - 24 Install flow divider and door trims
 - 25 Optional — Changing over door hinges
 - 26 Final checklist
 
24
!6DUAL INSTALLATION
Installing depth alignment gauges
Note: The alignment gauges are only temporary and removable after installation.
Required components/tools:
4x depth alignment gauges (847760)
Phillips screwdriver
1 Loosen the screws at the right 
and left, top and bottom corners 
of the door (A).
3 Attach the alignment gauges 
so that the screw head passes 
through the keyhole (C).
4 Lock the position of the 
alignment brackets in the 
keyhole, and tighten the screws 
just enough to firmly hold the 
gauges (D).
A
2 Locate the alignment gauge 
to the screws with the correct 
orientation (B).
C
D
B
B










