Installation Guide

14
US
CA
GENERAL
o Placement of Unit.
o Specified clearance maintained to cabinet surfaces.
o Unit Level- front to back, side to side.
o All packaging material and tie straps removed.
ELECTRICAL:
o Receptacle with 15 ampere circuit protection is provided for service cord connection.
o Adequate ground connection.
GAS SUPPLY:
o Connection: 1/2” NPT flex line with a minimum 5/8” diameter.
o The pressure regulator which is connected to the manifold is set for 4.0” W.C. for Natural Gas or
10” W.C. for LP.
o Manual gas shut-off valve installed in an accessible location.
o Unit tested and free of gas leaks.
OPERATION:
o All internal packing materials are removed, ie below grates, around knobs, etc.
o Knobs turn freely and correctly.
o Each burner lights satisfactorily, both individually and with other burners operating.
o Low flame operation verified.
o All burner caps, burner rings and burner bases correctly seated in position, level, and do not rock or slide.
o Burner grates correctly positioned, level, and do not rock.
INSTALLER FINAL CHECKLIST