Installation Guide
Table Of Contents
- Safety and warnings
- Tools and components
- Product dimensions
- Custom panel dimensions
- Cabinetry
- Plumbing & electrical considerations
- Hard-wiring (optional)
- Preparation
- Push the product into the cavity
- Fit custom door panels
- Secure to cabinetry via brackets (method A)
- Secure to cabinetry via drawer removal (method B)
- Install pre-finished toe kick
- Install custom toe kick
- Plumbing & electrical connection
- Installer checklist
- Troubleshooting
11
HARD WIRING (OPTIONAL)
9
!3
!0
!1
!2
Fix the Live and Neutral wires to the
terminal block and the Earth wire to
the chassis.
Position the cover fill valve into place
before lowering the rest of the cover
into position.
Lower the cover back into place
ensuring the locking clips are aligned,
the rear hook is positioned over the slot
and the L rib is cleared.
Lock clips back into place by pressing
down on the cover firmly. Ensure all
illustrated areas are engaged.
Refit screw to secure cover.
Ensure the hoses are not twisted before
refitting the drawer to the runners and
clipping into place via both locking tabs.
L rib
rear
hook
cover fill
valve
top view