Installation Guide

16
SECURE TO CABINETRY VIA DRAWER REMOVAL (METHOD B) INSTALL PRE-FINISHED TOE KICK
5
6
Before refitting the drawer, ensure the
hoses are not twisted.
Carefully score toe kick at
desired height.
Measure toe kick height against the
base of the lower tub.
1
2
3
4
Slide toe kick onto the mounting rails
and secure. Ensure a 1/2" (12mm)
clearance is maintained between
the floor and the toe kick, the end
tabs can be used to measure this
if desired.
Do not over tighten the screws.
min 1/2" (12mm)
Snap off excess toe kick material
and both end tabs.
Smooth the edges.
Refit the drawer to the runners and clip
into place via both locking tabs.