EXTERNAL VENTING PREPARATION
To prevent the build up of condensation produced by your DishDrawer™ Dishwasher, the external venting kit must be installed via one of the following options:
THROUGH SAME CABINET THROUGH ADJACENT CABINET THROUGH FLOOR
z
There is no minimum toe kick height for venting the
DishDrawer™ Dishwasher through the floor below the
cabinetry, the space below the floor however, must be a
sub-area of the house and have adequate airflow.
z
A Ø2 1/4" (Ø57mm) service hole should be created
through the side wall following the guidance under
‘Cabinetry preparation’. In addition to this, a Ø2 1/4"
(Ø57mm) service hole must be also be created through
the shelf, the base of the cavity and the floor to route the
venting hose through.
z
The duct is not required for this venting method.
z
Ensure all cutout edges are smooth and rounded and the
supplied edge protector is fitted if required.
z
Ensure cutout in the floor is sealed adequately.
z
A toe kick height of at least 3 15/16" (100mm) is required.
z
A Ø2 1/4" (Ø57mm) service hole should be created
through the side wall following the guidance under
‘Cabinetry preparation’. In addition to this, a second
Ø2 1/4" (Ø57mm) service hole must be also be created
through the shelf and the base of the cavity to route the
venting hose through.
z
Frameless cabinetry: A 3 15/16 – 7 7/8" (100mm x 200mm)
cutout must be created at the front of the cabinetry base
to secure the duct to.
z
Framed cabinetry: A toe kick depth of at least 2 3/8"
(60mm) is required. In addition, a 3 15/16 – 7 7/8"
(100mm x 200mm) cutout must be created within the
adjacent cabinetry base to secure the duct to. This cutout
should be set back a minimum of 1" (25mm) from the
frame edge for optimal venting.
z
A toe kick height of at least 100mm is required.
z
A notched-out Ø2 1/4" (Ø57mm) service hole should
be created through the side wall following the
guidance under ‘Cabinetry preparation’.
z
Frameless cabinetry: A 3 15/16 – 7 7/8" (100mm x
200mm) cutout must be created in the base of the
adjacent cabinetry to secure the duct to.
z
Framed cabinetry: A toe kick depth of at least 2 3/8"
(60mm) is required. In addition, a 3 15/16 – 7 7/8"
(100mm x 200mm) cutout must be created within the
adjacent cabinetry base to secure the duct to. This
cutout should be set back a minimum of 1" (25mm)
from the frame edge for optimal venting.
FRAMED FRAMED FRAMED & FRAMELESSFRAMELESS
ISO* ISO* ISO
FRAMELESS
1"
1"
7 7/8"
7 7/8"
7 7/8"
7 7/8"
3 15/16"
3 15/16"
3 15/16"
3 15/16"
Ø2 1/4"
Ø2 1/4"
Ø2 1/4" Ø2 1/4"
Ø2 1/4"
3/16" 3/16" 3/16" 3/16" 3/16"
custom framed edge custom framed edge
*Frameless install illustrated *Frameless install illustrated