Installation Guide

16
INSTALLATION INSTRUCTIONS
Final setup
Level the dryer
1 Stand the dryer upright near the final location
and adjust the four leveling legs at the corners to
ensurethat the dryer is level from side to side and
front to rear.
Plug dryer in
2 Note: stacking installations may require a power
cord up to 6feet (1.8m) in length.
Dryer startup
3 Press the ‘POWER’ button.
Note: if the dryer has been exposed to temperatures
below freezing for an extended period of time, allow
it to warm up before pressing ‘POWER’. Otherwise,
the display will not come on.
The dryer is now ready for use.
49-90571 19
Ensure proper
ground exists
before use.
Levelling the feet