Quick Start Guide

35
@1INSTALL TOE KICK
4 Place the toe kick in front of the mounting plate. Ensure that the spacers at back of the toe
kick are aligned with the magnets (E).
For custom toe kick, skip step 3 as spacers are not needed.
5 Attach the toe kick by pressing onto the mounting plate (F).
For stainless steel: Ensure the adhesive tape of the magnets adhere to the spacers of
the toe kick.
Ensure the bottom of the toe kick contacts the floor as you attach to the mounting plate.
IMPORTANT!
Two magnets are pre-installed to the bottom corners of the toe kick mounting plate. Each
magnet has double-sided tape to be attached to the toe kick. This allows both Stainless
steel and Custom panels to be attached to the magnet.
Required components/tools:
1x air kickstrip seal (846405)
1x toe kick
Installing the toe kick mounting plate and toe kick
1 If the toe kick depth is less than 35/8” (92mm), attach the air kickstrip seal (A) to the
middle of the back side of the mounting plate (B).
2 Attach the toe kick mounting plate (C) to the plinth.
F
3 Peel off the adhesive tape backing of the magnets located at the front bottom
corners of the toe kick mounting plate (D).
D
E
B
A
C
IMPORTANT!
For toe kick heights 41/2” – 5” (114–127mm), shorten the lower grille by cutting along
the vertical ribs.
For 2” (51mm) toe kick height, an additional lower grille can be ordered.
For toe kick heights greater than 5” (127mm), lower grille is not required.
Refer to ‘Door and toe kick panel dimensions’ for more information.