Installation Guide
Table Of Contents
- 1 Safety and warnings
- 2 Integrated columns
- 3 Components
- 4 tools
- 5 dual install options
- 6 appliance dimensions and specifications
- 7 Cabinetry options
- 8 Cavity dimensions
- 9 Door and toe kick panel dimensions
- !0 Custom door panel dimensions
- !1 Door clearance
- !2 Electrical and plumbing dimensions
- !3-A Electrical and plumbing specifications (FOR NZ & AU only)
- !3-b Electrical and plumbing specifications (for GB & EU only)
- !4 Before installation
- !5 cavity preparation
- !6-A water and power supply connection (For NZ & AU only)
- !6-b water and power supply connection (For GB & EU only)
- !7 Single installation
- !8 Dual installation
- !9 water filter InstallATION
- @0 door panel installation (Stainless steel)
- @1 door panel installation (Custom)
- @2 toe kick installation
- @3 cabinet trims Installation
- @4 door trims installation
- @5 Optional — Changing over door hinges
- @6 Final checklist
10
8 CAVITY DIMENSIONS
SINGLE INSTALL DUAL INSTALL
RS46 RS61 RS76 RS46 / RS61 RS46 / RS76 RS61 / RS61 RS61 / RS76 RS76 / RS76
CAVITY DIMENSIONS mm mm mm mm mm mm mm mm
A
Overall height of cavity 2134 2134 2134 2134 2134 2134 2134 2134
b
Overall width of cavity 457 610 762 1067 1219 1219 1372 1524
c
Minimum overall depth of cavity* if the plug is located inadjacent cabinet 635 635 635 635 635 635 635 635
Minimum overall depth of cavity* if the plug is located behind the appliance 650 650 650 650 650 650 650 650
d
Minimum cabinetry gap clearance from edge of door panels 3 3 3 3 3 3 3 3
e
Minimum required finished return 102 102 102 102 102 102 102 102
* Assumes a door panel thickness of 19mm.
Note: These dimensions are intended for ‘Flush Installation’ only.
E
D
D
Flush with front
of cabinetry
PLAN VIEW
E
D
D
E
E
D
D
E
B
A
C
B
A
C
Frameless: finished return
cavity sides and top
Framed: finished return cavity
sides and top