Installation Guide
Table Of Contents
- 1 Safety and warnings
- 2 Integrated columns
- 3 Components
- 4 tools
- 5 dual install options
- 6 appliance dimensions and specifications
- 7 Cabinetry options
- 8 Cavity dimensions
- 9 Door and toe kick panel dimensions
- !0 Custom door panel dimensions
- !1 Door clearance
- !2 Electrical and plumbing dimensions
- !3-A Electrical and plumbing specifications (FOR NZ & AU only)
- !3-b Electrical and plumbing specifications (for GB & EU only)
- !4 Before installation
- !5 cavity preparation
- !6-A water and power supply connection (For NZ & AU only)
- !6-b water and power supply connection (For GB & EU only)
- !7 Single installation
- !8 Dual installation
- !9 water filter InstallATION
- @0 door panel installation (Stainless steel)
- @1 door panel installation (Custom)
- @2 toe kick installation
- @3 cabinet trims Installation
- @4 door trims installation
- @5 Optional — Changing over door hinges
- @6 Final checklist
28
Installing depth alignment gauges
Note: The alignment gauges are only temporary and removable after installation.
1 Loosen the screws at the right and left, top and bottom
corners of the door (A).
3 Attach the alignment gauges so that the screw
head passes through the keyhole (C).
4 Lock the position of the alignment brackets in
the keyhole, and tighten the screws just enough
to firmly hold the gauges (D).
A
2 Locate the alignment gauge
to the screws with the correct
orientation (B).
C
D
B
B
Install fasteners kit
Cabinet depth
alignment gauge
(4)
Tools
Cross-head screwdriver
Powered driver (optional)
!8 DUAL INSTALLATION