Installation Guide

39
4 Place the toe kick in front of the mounting plate. Ensure that the spacers
at the back of the toe kick are aligned with the magnets (E).
For custom toe kick, skip step 4 as spacers are not needed.
5 Attach the toe kick by pressing onto the mounting plate (F).
For stainless steel: Ensure the adhesive tape of the magnets adhere
to the spacers of the toe kick.
Ensure the bottom of the toe kick contacts the floor as you attach
to the mounting plate.
IMPORTANT!
Two magnets are pre-installed to the bottom corners of the toe kick mounting plate. Each magnet has double-sided tape to be attached to the toe kick.
This allows both Stainless steel and Custom panels to be attached to the magnet.
Install the toe kick mounting plate and toe kick
1 Reattach the toe kick mounting plate (A) to the plinth with 8x16mm
cross-head screws.
If the toe kick depth is less than 3 5/8 in (92mm), attach an air toe kick
seal (B) to the middle of the back side of the mounting plate (C).
3 Peel off the adhesive tape backing of
the magnets located at the front bottom
corners of the toe kick mounting plate (D).
F
E
C
B
A
IMPORTANT!
For toe kick heights 114 127mm, shorten the lower grille by cutting
along the vertical ribs.
For 51mm toe kick height, an additional lower grille can be ordered.
For toe kick heights greater than 127mm, lower grille is not required.
Refer to ‘Door and toe kick panel dimensions’ for more information.
Miscellaneous
components
Air toe kick seal
(1)
Toe kick install kit
Toe kick
(1)
D
@2 TOE KICK INSTALLATION