User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 4
2.2. Preparing the Floor
Before the cabinet can be placed into position, mounting holes must be drilled into the floor.
There are a total of 8 clearance holes in the base of the cabinet — 2 in each corner. Figure 2.1
Clearance Holes in RadioRouter Base — Schematic View shows the positioning of the holes.
Figure 2.1 Cle arance Holes in RadioRouter Base — Schematic View
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003