User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 16
4.2. Connecting to Power and Ground
The power distribution panel with the power connections are located at the bottom of the
cabinet. The power distribution panel contains circuit breakers and is visible from the front. The
connections are at the bottom of the panel. To reach them, remove the front access panel.
Figure 4.6 Access to Power C onnections — Front View
Once the front panel is removed, the connections are visible from underneath.
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003
Page 16