User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 22
2.
Remove the DSX cables from the connectors. Figure 5.2 DSX Cables in T1 Connectors
shows the cables in the connectors. Figure 5.3 DSX Cables Removed from T1 Connectors
shows the connectors with the cables removed.
Note:
Removing the DSX cables will disable the DSX-1 panel. The DSX cables must be reconnected to
use the DSX-1 panel.
Figure 5.2 DSX Cables in T1 Connectors
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003
Page 22