User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 32
Chapter 8. Powering Up the Cabinet
The cabinet requires DC p ower to operate. Before attempting to power up the cabinet, verify that
DC power is available. It may be necessary to wait for a maintenance window to connect the
cabinet to DC power and perform this procedure.
WARNING:
ALL POW ER OPERATIONS SHOULD BE PERFORMED BY QUALIFIED
PERSONNEL ONLY. BEFORE ATTEMPTING TO POWER UP THE
SYSTEM, CONFIRM THAT ALL POWER CONNECTIONS HAVE BEEN
MADE PROPERLY.
CAUTION:
After the RadioRouter BaseStation is powered up, it cannot be
powered down without the use of a craft access terminal. Powering
the BaseStation down without the use of a craft access terminal co uld
permanently damage the equipment.
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003
Page 32