User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page 34
1.
Turn on the RRC breaker. The RRC breaker is on the left as you face the cabinet. See
Figure 8.2 Circuit Breakers — Front View
Figure 8.2 Circuit Breakers — Front View
2.
Turn on the LNA breakers which are located next to the RRC breaker.
3.
Turn on the PA breakers. The PA breakers are on the right of the LNA breakers.
RadioRouter
®