User's Manual
Table Of Contents
- toc
- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page A-1
APPENDIX A
RadioRouter BaseStation Site Preparation Punchlist
Site Preparation Items If Okay OR Describe Outage
Environment
Adequate Clearance: 24” front 6” rear
Electrical system
Electrical outlets
Master Ground Bar
Other
Antenna plant
Surge arrestor mounting
6 Tx/Rx antenna line surge protectors
T1 connection
T1 surge arrestor
Surge arrestor grounded
Alarm connection
1 AC power failure alarm termination point
1 high temperature power failure alarm
termination point
Cable Support
Trays or other support
Cables
DC power cabling: #6 AWG THHN or THWN
Ground cabling to master ground bar: #6 AWG
THHN or THWN
RF cabling to surge arrestors: 50–ohm
semiflexible rigid
T1 cabling: 2–pair shielded
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003
Page A-1