- Issue Date: 08- 04- 2003
- Overview
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Indoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- 4.1. Routing the Cables
- 4.2. Connecting to Power and Ground
- Connecting the Core Network Cables
- Connecting the Antennas Cables
- Installing the Alarm Connections
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- 10.1. Verifying the Physical Installation
- 10.2. Verifying the Base Station Operation
- RadioRouter BaseStation Site Preparation Punchlist
- RadioRouter BaseStation Installation Punchlist
- tables
Page B-1
APPENDIX B
RadioRouter BaseStation Installation Punchlist
Installation Items
If Okay
OR Describe Outage
Overall
Cabinet is physically intact
RadioRouter Chassis
MCU
BHU
PCU
BBU
TXU
RXU
AIU
LNA/Duplexers
Power Subsystem
T1/Ethernet
Alarm Connection
Antenna Connections
Other
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.5 - © 2003
Page B-1