User's Manual

Powering Up the Cabinet
1.c.
Connect the leads of the volt meter across the screws as shown in Figure 7-5: Load
Center 120 VAC Test Points Test 2. The voltage across should be 120 VAC.
Figure 7-3: Load Center 240 VAC Test Points
Figure 7-4: Load Center 120 VA C Test Points Test 1
© 2005 Flarion
Flarion Proprietary and Confidential
Version 1.3
Page 7-3