Warnings
When Installing, connect grounds, Battery+, PV+ then install the Fuse in
that order. This not required however it will reduce the risk of arcs and
sparks.
CAUTION Ground yourself before touching the wiring to dissipate any static charge. Wear a
ground strap if possible while working on the system.
ALWAYS SOLDER AND WEATHER SEAL ALL system wire-wire and
wire-crimp terminal connections. If this is not done, the system will be
plagued with operational problems shortly after it is installed. This is true
for any controller in a PV system.
Before touching the 12V/24V select wire on the back of the unit, touch
and hold a system ground connection with one hand. This will help
reduce any chance of potentially inducing damaging High Level Static
Discharge into the controller.
Table of Contents
Page Contents
1 Cover
2 Warnings & Table of Contents
3 Features
4 Installation Instructions
5 Typical Installation Schematic Diagram
6 Flexcharge “Energy State Taper Charge” Algorithm Explained
7 Troubleshooting Guide
8 Warranty