01 Package Content (A) Parts Included Connecting Plate A x4 Connecting Plate Calling Bracket x6 Frame Beam x8 L-Shaped Upper Vertical Post x4 = Frame Stiffen x6 Upright Upper Vertical Post x2 Wire Grid x4 \ L-Shaped Lower Vertical Post Installation Template Upright Lower Vertical Post x2 \ (B} Accessory Packages Figures shown are for reference only. Please contact customer service if there are any accessories or tools missing.
A Safety Warning Step 2-A: Install Ceiling Bracket Parallel with Joists = This product contains small items that could be a choking hazard if swallowed. Keep these items away 1. Use a stud finder to locate the wooden ceiling joists. Then use the installation template from young children. mark the mounting points. « Make sure these instructions are read and completely understood before attempting installation.
05 Step 2-B: Install Selling Bracket Perpendicular to Jolts 1. Use a stud finder to locate the wooden ceiling joists. Then use the installation template to mark the mounting points. Poncho Stud Finder Locate the Wooden Ceiling Joists AN Note: The Installation template is reusable for marking mounting points on each side. A Note: For a perpendicular Installation, ensure Marie Mounting Holes that the ceiling joists are 48" apart. 2. Drill a 2.4" (60mm) deep pilot hole with a 11/64" 3.
07 Step 4: Determined Location of Vertical Posts Make sure the distance between the posts are completely consistent with the figure shown. Always install the vertical posts between a E— the bolts in the ceiling bracket. Do not x attach the vertical posts outside. Otherwise the ceiling brackets will bend, causing personal injury or damage to your stored items if they fall. Step 5: Attach Vertical Posts to Ceiling Brackets m— 1. Attach L-shaped vertical posts to ceiling brackets using bolts (A) and nuts (B).
Step 7: Assemble the Frame Stiffeners Assemble the frame stiffeners to the combined frames using bolts ®, and tighten with hex key (H). ~ [oF Bolts (C) / Hex Key (H) Step 8: Place and Fix the Frame Components 09 1. Place the frame components to the posts, and fix the components using bolts (C) at the corner, then tighten with hex key (H). 2. Using hex key {H) to tighten bolts (C) to fix the frame components with lower upright posts at the middle.
11 Step 9: Place and Attach Wire Grid Tips A 1. For safety, be sure to use the screws provided in the product package. 2. Do not stack heavy objects together, please place them evenly. 3. Please do not stand below the racks for a long time, and children are strictly prohibited from playing near the racks. Use of Metal Expansion Bolt The metal expansion bolt is needed if installing to a concrete ceiling {mental expansion bolts are not included).