Junction Box Type KEEX-4 TECHNICAL MANUAL Flintec GmbH Bemannsbruch 9 74909 Meckesheim GERMANY www.flintec.
RIGHTS AND LIABILITIES All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, mechanical, photocopying, recording, or otherwise, without the prior written permission of Flintec GmbH No patent liability is assumed with respect to the use of the information contained herein. While every precaution has been taken in the preparation of this book, FLINTEC assumes no responsibility for errors or omissions.
ELECTRICAL CONNECTIONS connection side output cable Figure 1: Dimensions in [mm] The connection sequence of the load cells should correspond to the corners of the scale, i.e Corner 1 = Load cell 1, Corner 2 = Load cell 2, etc. LOAD CELL CABLE CONNECTION First the cable gland must be loosened. Then you have to feed the load cell cable through the cable gland unless the shrink tube is fully disappeared in the box.
OUTPUT CABLE CONNECTION The signal cable (connection between junction box and the following electronics) should be a 6 – wire shielded cable and has to be kept as short as possible. Depending on type and manufacturer signal cables may have different colours. Therefore make your own choice. Cable colour, example outer cable screen pink white grey brown yellow green Description = Shield = –Output / Signal – = +Output / Signal + = –Sense = –Input / Excitation – = +Sense = +Input / Excitation + Terminal no.