Instructions / Assembly

Instructions for Use | 11
STEP 1:
prep
Inspect your Floorigami material prior to installation. Contact us at 1.844.742.7429 if a
visible manufacturing defect exists. If such a defect is installed, Shaw is not liable for the
installation.
A proper installation depends on the proper site conditions. The following conditions
must be maintained for 24 hours prior to, during and permanently after installation:
HVAC System: Must be operational maintaining the following conditions.
Temperature: The installation site, carpet and adhesive must be between 50° F
and 95° F.
Humidity: The installation site’s ambient relative humidity should be between
40-60%.
The existing hard surface floor must be structurally sound, clean, level and dry before
you begin.
Sweep and vacuum your floors and ensure they are free of dust, dirt, oil, grease, paint,
curing agents, concrete sealers, loosely bonded toppings, loose particles and any other
substance or condition that may prevent or reduce adhesion.
Plywood Subfloors: Floors must be Wood Association Approved and primed with a paint
roll application of liquid primer such as Shaw 9050.
Concrete Subfloors: Fill depressions or cracks by using a leveling compound containing
Portland or high alumina cement that meets or exceeds the compression strength of
3,000 PSI.
YOU’LL NEED: Broom
PRO